top of page

Unitywater Principal Engineer Support 

August 2021 

​

Six month secondment role as Principal Design Engineer for Unitywater providing technical advise and design support to Capital Delivery, Planning, Development Services and Operations.

Wamuran Irrigation Scheme 

March 2022

​

Superintendents representative services on Wamuran Irrigation Scheme (WIS), to supply recycled water to the farming sector within the Wamuran region. Implementation of this objective is being implemented under two contracts:
· Caboolture South STP Recycled Water Disinfection Facility: a construction-only contract to upgrade the Caboolture South Sewage Treatment Plant (CBSSTP) and  Recycled Water Treatment Plant (RWTP) to reliably produce and supply recycled water to the WIS.
· Wamuran Irrigation Scheme: a D&C Master Agreement with a construction contract awarded for Stage 1 of the recycled water transfer and distribution network infrastructure from the CBSRTP to the various scheme participant delivery points.

 

Bribie Island STP
Bioreactor Aeration Upgrade and Inlet Works Refurbishment

January 2022

​

Business case and concept design development of bioreactor replacement aeration pipework and new package inlet work for Bribie Island Sewage Treatment Plant.

Harmony Pipeline.PNG
Biological Purification
thrustblock.png
Plans.jpg
Wamuran.jpg
Aeration Pipework.png

Our Projects

What We’ve Accomplished

Unitywater Aura Harmony Program
Superintendent Representative Services 

May 2023 

​

Superintendent representative services on Unitywater Aura Harmony Project.

​

The Aura Water project includes constructing a new 12ML water reservoir and installing 12 kilometres of OD660 MSCL water pipeline from the Ewen Maddock Water Treatment Plant to Aura in Caloundra South.  Includes two HDD and two thrust bored sections.

​

The Harmony Water Project includes constructing a 12ML water reservoir at Tanawha and installation of 2.6 kilometres of DN450 and DN500 DICL water pipeline from the reservoir to Harmony in Palmview. Includes one HDD section

​

The Aura Wastewater project includes construction a new wastewater pump station and installation of 12.5 kilometres of OD900 and OD710 HDPE wastewater pipeline to transfer wastewater to our Kawana Wastewater Treatment Plant from Aura in Caloundra South. Includes four HDD sections. 

​

​

Unitywater Sewerage Treatment Plant Renewal Concept Business Case Development 

October 2023

​

Development of numerous Concept Business Cases for Unitywater for Sewerage Treatment Plant Renewal works including:

  • Aeration diffuser renewal

  • Balance tank coating replacement

  • River walkway replacement

  • Sludge building roof renewal

  • Switchboard room overheating improvement

  • Effluent storage tank floor joint repair

  • Elevated concrete walkway repair

  • Secondary clarifier bridge review

  • Tanker discharge autosampler installation  

Thrustblock Design for Poisson Effect in Low Strength Soils
 

September 2023

​

Forces acting on the thrust blocks from the pipeline thermal contraction or expansion, Poisson’s contraction and pipe diameter reduction within very low bearing capacity soils.

Unitywater Principal Engineer Support 

August 2021 

​

Six month secondment role as Principal Design Engineer for Unitywater providing technical advise and design support to Capital Delivery, Planning, Development Services and Operations.

Wamuran Irrigation Scheme 

March 2022

​

Superintendents representative services on Wamuran Irrigation Scheme (WIS), to supply recycled water to the farming sector within the Wamuran region. Implementation of this objective is being implemented under two contracts:
· Caboolture South STP Recycled Water Disinfection Facility: a construction-only contract to upgrade the Caboolture South Sewage Treatment Plant (CBSSTP) and  Recycled Water Treatment Plant (RWTP) to reliably produce and supply recycled water to the WIS.
· Wamuran Irrigation Scheme: a D&C Master Agreement with a construction contract awarded for Stage 1 involving 22km of pipeline between the Caboolture South Recycled Water Treatment Plant (RTP) and farm gates in the Wamuran region. Also development of Moodlu Quarry to a water storage facility with a 2ML flow balancing tank, distribution pump station and a floating pump station along with other critical infrastructure.

Bribie Island STP
Bioreactor Aeration Upgrade and Inlet Works Refurbishment

January 2022

​

Business case and concept design development of bioreactor replacement aeration pipework and new package inlet work for Bribie Island Sewage Treatment Plant.

Projects 
prior to founding INOV8 H2O

IMG_1595.JPG
  • Unitywater Strategic Infrastructure Delivery Partner Agreement Panel involving design of pump station refurbishments, reservoirs refurbishments and pipeline replacement designs.

  • Unitywater Sewage Pump Station and Reservoir Refurbishment Project designs.

  • Unitywater emergency Finland Road 2 km DN450 bypass water main design. (Project Team completed design, procurement and construction within one month).

  • Finland Road Replacement 610OD SKCL Trunk Water Main design.

  • Reservoir Renewal Projects including Unitywater Maintenance Panel activities engineering support.

  • Concept Design Manager for Sydney Water’s Lower South Creek $550M collaborative works program involving:

    • St Marys WRP: 48 ML/day ADWF biological nutrient removal plant with 140 t/week biosolids treatment using anaerobic digestion and thermal hydrolysis with energy recovery; and

    • Quakers Hill WRP: 38ML/day ADWF aerobic granular sludge plant with 10ML/day of biosolids and sewerage transferred for treatment at St Marys WRP.

The program adopted three new innovative wastewater process technologies, including the first installations into Australia. The three new technologies include:

  • Thermal Hydrolysis Process (THP) used for biosolids treatment to increase energy recovery from biogas recovery, reduce power consumption via a cogeneration plant and reduce cost of biosolids to landfill due to the improvement of biosolids quality and reduction in volume;

  • Aerobic Granular Sludge (AGS) used for biological nutrient removal with the benefit of reduced energy consumption, reduced footprint through elimination of secondary clarification and reduction in capital cost; and

  • Mechanical Primary Sedimentation (MPS) used to remove suspended solids from the primary treatment process, with the advantage over traditional primary sedimentation of a reduction in site footprint.

  • Vacuum sewerage scheme extension design for Frasier Coast Council. 

  • Design Landers Shute WTP Lime Upgrade D&C.

  • Design Manager Gympie Weir Biopassage.

  • Enhanced Condition Assessment Project hydrant and pipeline replacement development.

  • Lander's Shute Clearwater Storage Bypass design.

  • North Pine WTP Filter Upgrade D&C design.

  • Rubyanna WWTP River Outfall Reference design review.

  • Redcliffe STP concept design manager for Veolia team.

  • Maroochydore STP Competitive Alliance formation.

  • Decerto Automated SCADA control and energy management system implementation overview.

  • Managed implementation of three mobile computing systems for operational efficiency.

  • Overview GIS & Maximo/Hansen Asset management system implementations.

  • DN600 DICL Trunk Water Main Design Woombye to Kunda Park.

  • Numerous backlog sewerage schemes planning, design and construction supervision.

  • Numerous reservoir construction supervision projects 0.2ML to 12ML. 

ABN 45 657 122 140

  • alt.text.label.Facebook
  • alt.text.label.LinkedIn

©2022 INOV8 H2O

bottom of page